Radiotherapy Centre in Piła construction of the medical facility

  • Completion date: 2016 - 2018
  • Address: Piła, ul. Rydygiera
  • Area: 2823 m2
  • Investor: Wielkopolskie Centrum Onkologii
  • Project: -
-

Radiotherapy Centre in Piła

The whole facility is fully available to the disabled. The design of the centre also provides for the modern hostel for patients and guests, with a separate entrance from the north side of the building, combined with the bunker and diagnostic sections. As well as the 10 double rooms including bathrooms, the so called daily zone joining the kitchenette, nurse room and club and sanitary rooms have been designed.The latest investment of the Wielkpolska Centre of Oncology provides for the construction of the modern Radiotherapy Centre. The design of the building was prepared by the Poznan based design studio: Spółka Projektowania Architektonicznego Sadowski Sadowska.

The completion of the investment involves the construction of a two-storey building with the net area of over 2800 m2, the necessary technical infrastructure as well as inner roads and car park for 43 parking spaces, the reconstruction of the existing transformer station and the land development. The utility premises and the main hygiene-sanitary rooms for the personnel will be located at the basement level. On the ground floor, there will be two bunkers for high-energy accelerators, simulator room and CT scanner, main hall with the reception desk and dressing room, waiting rooms and changing rooms for patients, doctor’s offices and surgeries as well as didactic room and tele-conference room. On the first floor, there are, above all, clinics, diagnostic labs and waiting rooms. Over the accelerator bunkers, a green roof visible from the windows of a taller building is designed.

During the construction of the facility, where the tele-radiotherapy procedures are supposed to take place, we will, for the first time, cooperate with the National Atomic Energy Agency.

 The whole facility is fully available to the disabled. The design of the centre also provides for the modern hostel for patients and guests, with a separate entrance from the north side of the building, combined with the bunker and diagnostic sections. As well as the 10 double rooms including bathrooms, the so called daily zone joining the kitchenette, nurse room and club and sanitary rooms have been designed.

The construction work will last about 24 months.

more

Location of the investment

ZADZWOŃ WIADOMOŚĆ

Internet Marketing Agency: widoczni
Widoczni