Eureka Technology Park II construction of the office building with the data center

  • Completion date: 2014 - 2015
  • Address: Konstantynów Łódzki, Łąkowa Street
  • Area: 8625 m2
  • Investor: Eureka Technology Park Sp. z o.o.
  • Project: PTB Nickel Sp. z o.o.
  • see references
-

Eureka Technology Park II

This new science and technology park was built on the land plot of over 11 000 m2. As part of the completion of the investment, a 3-storey stand-alone, slab-on-grade building including the whole external infrastructure was built.
The almost 8600 m2 facility will house about 600 employees and consist of offices, conference rooms, modern data centres, food and services facilities, and technical premises.

ELECTRICAL SYSTEMS

  • power supply,  15kV MV cable line,
  • container transformer station (including two transformers) with the power of 2.5 MW,
  • power supply from the transformer station, from an independent transformer intended for the Data Processing Centre (DPC) via LV 0.4 kV cable line with the power of 1.25 MW,
  • reserve power supply source in the form of the external power generator with the power of 0.64 MVA, with the external fuel tanking system,
  • guaranteed power supply system (UPS), consisting of 3x UPS 120 kVA, operating in parallel in the n+1 system,
  • VESDA very early smoke detection system,
  • CCTV IP monitoring system,
  • intrusion detection system,
  • access control system including biometric readers,
  • fire alarm system,
  • structured cabling system based on fibre-optic and copper solutions,
  • monitoring system for the most important parameters of the system and equipment, including visualisation.

MECHANICAL SYSTEMS

  • precision air conditioning system consisting of water chillers with the cooling power of 3x140kW, precision air conditioning cabinets in the server chamber with the cooling power of 4x84 kW, and precision air conditioning cabinets in the UPS room, with the cooling power of 2x40 kW. System operating in the redundant circuit n+1,
  • Gas Dump Fire Suppressant System with the extinguishing medium HFC-227ea,
  • monitoring system for the most important parameters of the system and equipment, including visualisation.

more

artur gulinski

Artur Guliński

Investment completion director

 